Not only do we build booths to client spec but we also retrofit old machines with new mechanics.  In Mid April we took two days to replace the old chemical processing system of the 1960s booth at the Drake Hotel in Toronto with a whole new modern mechanical system.   The machine now prints in a few seconds vs 3 minutes!!

The story behind the old machine at the Drake is that it was in the Montreal subway in the 1960s.

Client:  The Drake Hotel Toronto